Temporary industrial chiller installed at a UK site

24/7 emergency chiller hire

CHILLER DOWN?
WE MOVE.

Rapid temporary cooling for breakdowns, lost capacity and rising temperatures, coordinated nationwide by experienced engineers.

24/7Response line
RapidFleet mobilisation
UKNationwide coverage

The requirement comes first

FAST, WITHOUT GUESSWORK.

When temperatures are climbing, speed and good engineering have to happen together. One coordinator establishes the duty, site constraints and connections, then mobilises the complete package.

Engineered temporary cooling

BUILT AS
ONE SYSTEM.

01

Rapid assessment

Critical temperatures, loads and immediate risks are established quickly.

02

Priority equipment

Available chillers and ancillaries are matched to the real requirement.

03

Turnkey mobilisation

Transport, positioning, connection and commissioning are coordinated together.

04

Continuity planning

Redundancy and temporary power can be included where the risk demands it.

From requirement to running

ONE TEAM.
FOUR STEPS.

  1. 01

    Call

    A cooling specialist establishes the incident and location.

  2. 02

    Assess

    Temperatures, flow, connections, access and power are reviewed.

  3. 03

    Match

    Chiller, pumps, hoses and transport are assigned.

  4. 04

    Mobilise

    Arrival, installation and commissioning are coordinated.

Before we specify equipment

WHAT WE
CHECK FIRST.

The right answer comes from the operating detail. These are the points our engineers will work through with your team.

01

Current temperature

We need to understand how quickly the process or space is warming.

02

Critical load

Protect the operation that matters first, then add wider capacity if needed.

03

Temporary connection

Existing isolation points, hose routes and safe access affect response time.

04

Power availability

The chiller and pump package must match the site supply or include temporary generation.

Complete hire package

EVERYTHING
CONNECTED.

One accountable team can coordinate the equipment around your duty, site and programme.

Frequently asked questions

PRACTICAL
ANSWERS.

How quickly can you respond?+

Response time depends on location, equipment availability, access and how quickly the duty can be confirmed. The emergency team works around the clock to coordinate the fastest safe mobilisation.

What should I have ready when I call?+

Site postcode, current temperatures, known chiller duty, flow and return temperatures, connection sizes, available power and site access details are useful. Call even if some of that is unknown.

How long can I hire a chiller for?+

Hire periods can cover a short breakdown, a planned maintenance window, seasonal demand or a longer project. We shape the agreement around the programme.

What happens if there is a problem on hire?+

Gradwell Chiller Hire provides technical support throughout the hire. For urgent requirements, the response team is available 24 hours a day.

Specialist chiller hire

Nationwide temporary coolingProcess chiller hireHVAC chiller hireHeat-pump chiller hireLower-GWP chiller hireLow-temperature chiller hireNon-ferrous chiller hireFree-cooling hire

Start with the requirement

WHAT NEEDS
COOLING?

Share your required temperatures, process load, site and dates. Our specialists will recommend a practical temporary system.

Request a quote